Friday, January 6, 2012

We Got Driveway!

Hello everyone.  Welcome to the year 2012!

I hope that everyone is having a wonderful time to start the year and to those who have and will start their building journey, all the best of luck and hope that our experience maybe of some assistance to all.

Our journey has been a pretty long one with some rocky road along the way.  This would probably the last leg of the hurdle that we need to get through in order to get our house to a handover stage.

It would appear from the outside that everything is done and there is not much to do on the inside also.  Other than some fixing up to do like windows, doors not being able to close properly, site clean up, cornices are missing on top of the entrance door front portico, fly screens, paint to the rendered post and some other things that I probably have no clue about, I'd definitely say we're almost there.

However with that being said, there is apparently 5 weeks industry shut down where no tradies or supplier is working or open during the month of January until early February or so I've been told.

The frustrating part is that there has been lack of communication from Metricon and our site supervisor recently with our progress.  I had to chase them up for updates on our house.

We've also taken the step to get some quotes for dividing fences to our neighbours.  I've got two quotes that are very far apart on the amount.  There is about $2000 difference between the two quotes!  Please contact me via the "Contact Us" page if you are interested in getting the contact details for the fencing company.

From our recent visit, I noticed that the driveway has been paved and the window wasn't locked.  So I was able to sneak inside for a quick peek of the house.




I felt like a geek having to post this image.

Shower frame is up.

Friday, December 23, 2011

End of the Year but It's Not Our Handover

So here we are with a couple of more days to go before Christmas.

The house is still under construction and the wheather also hasn't been very supporting for the last couple of weeks.  We didn't hear anything from our SS also.

I decided to ring him yesterday just to find out what has been happening and when can we expect the handover date is.

Well as you might have guessed it, it is not today...  It's more like early January now barring any issue from conditions and inspections from the councils and ourselves.

Driveway should be paved this week and the concrete has been laid as it's foundation.  The nature strip driveway will stay as it is though :). 

I was advised that they were doing some work like caulking inside the house.  I didn't understand the term caulking at first but apparently my smart phone does!!  How very cool is the technology today :).

This would also be my last post for the year and I like to thank you to all who have followed our journey thus far and I hope to see you all again in the new year :).

Wishing a Merry Christmas and a Happy New Year!



Our selected pavers

Monday, December 12, 2011

Driveway

Construction is moving along towards the end and I believe we only needed the driveway to complete.  There are some other final touch ups and fixes that we'd like to see but at least all the major work is very near. 

We are hoping for the handover to happen before the Christmas.  But then again we still aren't able to move in as we still need to put down the floor boards.  Not to mention that there are still a couple of inspections to go through.

In one of my earlier post, I've alluded to the fact that I still need to do the council strip driveway because this wasn't included in our contract with Metricon...

How very wrong I was....!

Here is the prove.


This mean that I don't need to waste anymore time looking for concreter for our driveway.  Thanks to our SS.

Friday, December 9, 2011

So close yet so far...

The time for completion is just right there.  It is very close but yet so far...  I wish the rain would stop for about a week so that the driveway paving work can be completed.  Today's been very good...

We are also waiting to find out whether the council strip concrete is included in our driveway package.  This reminds me that I have to ring our SS later on today.

We also have rang the guy from Ezy Clip Fencing, who mostly do the fencing work for our area, to get a quote.  I am still new in having a house build so my understanding is that we needed to get three quotes from three different vendors and send them to our neighbours, left and right hand side as well as the back side as they should be paying half of the boundary fence.  If anyone can give me some more insights on this that would be much appreciated.

The next thing to do is also we have rung around to get some quotes in to install solar panel system.  We had a look around at the home show earlier this year but it would be nice if I can get the solar panel system installed with the construction of the house.

We then need to get the flooring guy to come out and do the final measurement.  Possibly we won't be able to do this until the handover time.

Like I said earlier, so close yet so far...

Piccies from last weekend.  We can't go inside the house as it is too muddy for us to step in.

There is a garage door now!  Our neighbour next door has finally started building.

Looks like they installed the wardrobe door as well

Can't wait to move in!