Sunday, March 20, 2011

Electrical Appointment

This would be a very tricky post as I can't find the pictures of what we have selected.  But hopefully I can give some insights into our selection.

From my earlier post regarding the promotion package and as I have mentioned many times, we are already getting some quality designer products, so there won't be many additions here.  But in case you were wondering, our total upgrade in electrical cost more than internal color selection...

So why does this cost more?

For most part, I am not an electrician and from what I was told by our consultant, only those who have electrician skills and it is what they do for a living, their electrical selection are far lower than our cost.  On average, electrician spend between few hundred to couple thousand dollars at maximum for their upgrade.  This is because for most of the area, they can do it themselves.

I considered a lot of options before going to our electrical appointment but ultimately, anything that is related to electrical, we are better off doing it early while the house is still in it's frame stage.  Doing electrical work after the handover, especially being a double storey house, would cost a lot more than what we are spending right now.

We avoided getting fittings as much as possible but eventually a couple did slipped in to our contract variation quote.

What we did end up getting in our electrical appointment session:


  1. Home Networking System - coming from an IT background, the first question that I ask at the appointment was "I like to install the network hub that you've got on the display corner there, can you tell me how much it costs?"  Our consultant just smiled and said that she already guessed that I will ask the question.  I opted to install the Cat 5e networking system as installing Cat 6 would blow our budget by far.  I must admit if this was a single storey house, I might do this work after the handover.  However we are building a double storey house and like I said previously to do this type of work after handover would be a nightmare and ended up costing more.
  2. Mini cabinet downlight fittings to niche cutout near the dining room.
  3. Additional air conditioning zone.
  4. Additional alarm sensor to the master bedroom.


As far as getting some fittings concerned, we are getting this light bar to be installed above the mirror in the ensuite.


Total damage in our electrical appointment was close to $6000.

Combining the total cost for internal and electrical selection, our wallet is about $10k thinner.

Saturday, March 19, 2011

Taps, Hardwares/Accessories, Handles, etc.

Well mostly we left everything to what we've got in Metricon's reflection promotion.  Little that we know, the bathroom, kitchen and laundry hardwares that included were exceeding my expectations already.  I was like are you sure that we are getting all these?  Our consultant said, yes, they are part of the promotion that we purchased.  I know that the promotion package has a lot of upgrades in it but I didn't think it would be that good and well worth it.

To this date I have no regret whatsoever with our purchase of the promotion package.

So on to the main topic here are what we are getting:

General choices:

We've added a deadbolt lock to the external door in the laundry room with the model below.

We have also upgraded all the handles for every cabinets that we have in the house.  This also applies to the linen cupboard on the ground floor as well as first floor.  So all cabinets in the kitchen, laundry, powder, bathroom and the ensuite will have this handle with the length and size to suit.  i.e. for longer drawer we will have longer handles.  The handle option below is in fact a standard option so it costs nothing to upgrade to the shorter version of the handle.  The only upgrade is the longer handle which cost us around $15 per handle.








Bathroom choices:

Semi-recessed basin
Above the counter basin
We elected to have the basin above the counter in the powder and bathroom.

The semi-recessed basin will be in the ensuite.  Having the semi-recessed counter require us to extend the caesarstone that we have to act as an apron for the vanity unit.










Moda Duo Rail - Standard Shower Head

Wall mixer for the shower

Star double towel rail
Metza Rectangular Hob 200mm Spout for the bath

Alto basin mixer


Alto Toilet Ring
Alto Soap Holder




Kitchen choices:
Clark Quatro Double End Bowl



There is not much upgrades here as we have already upgraded the entire kitchen upon the tender request.  Our kitchen should look very similar to the one in the display house at The Ponds, Tribeca display.

One thing that we added was the wine rack above the fridge.

Laundry choices:

As part of the promotion package we have already got the 2 cupboards and the broom cupboard as standard but we added another cupboard like the picture above just so that we can have some space whenever we needed to do anything there.


In Studio M product book, this is listed as an upgrade item.  However we are getting this as part of the promotion package.  The only upgrade here is the tap.  Cost around $40.
Apologies for the picture quality as they are scanned.  I've tried to find some pictures for the product but it isn't showing up even on the search engine.

The total damage done for internal colour selection including the accessories is about $4,500.
Related Posts with Thumbnails